Case study 03
Warehouse & dispatchEvent logistics

Two van loads matched a four-day event plan, item for item

A cup can serve breakfast on several days and travel to the venue only once. We built reservations, picking and returns around where the equipment actually is, then replayed a four-day event against its issued van lists.

The situation

Some equipment travelled ahead of the service that needed it. Some stayed at the venue to be washed and reused. Adding up each day’s requirements would overstate the load, while releasing equipment early could promise the same stock to another event.

The decision

Reserve stock for the time it is away from the warehouse. An item that stays at the venue overnight can cover another service while remaining unavailable to another event.

What we built

  • We linked service dates, stock reservations, van loads, washing and collection so the warehouse can follow a physical item between services.
  • A picker can see the dish or service behind a requirement, check a substitution and record what was packed.
  • We added checks at dispatch and collection. In the rehearsal, an outstanding equipment return held up final collection until a member of the team recorded it.

How we checked it

We replayed the menu selections and substitutions with the issued van lists held back for comparison. The custom system calculated 554 equipment units for Monday and 726 for Tuesday. Both matched the issued figures, including zeroes for equipment that stayed behind.